Unit Cost detail

Muro en concreto E=0.10 M

Owner: Geztio Latam

Find the detail of the cost of (m2) of Muro en concreto E=0.10 M . Materials, equipment, transport and labor required.

Materials
DescriptionUnitQuantityWasteValueSubtotal
This Unit Cost does not include any material 0.00
AWaste 0.00
B
Waste + Material subtotal 0.00
Equipment
DescriptionUnitQuantityProductionValueSubtotal
Vibrador de concreto día 1.00 4.33 52,300.00 12,078.5219
Herramienta menor % 1 10 45,155.0843 4,515.51
C
Equipment subtotal 16,594.0319
Transportation
DescriptionUnitQuantityDistanceValueSubtotal
This Unit Cost does not include any transportation 0.00
D
Transportation subtotal 0.00
Labor
DescriptionTimeUnitQuantityProductionValueSubtotal
Cuadrilla 1:2 (oficial + 2 ayudantes) 100.00 día 1.00 5.93 267,769.65 45,155.0843
E
Labor subtotal 45,155.0843
F
(A + B + C + D + E) Direct cost 61,749.12

Frequently asked questions

What materials are used for m2 of Muro en concreto E=0.10 M?

Muro en concreto E=0.10 M doesn't require any materials.

What equipment is used for m2 of Muro en concreto E=0.10 M?

  • 1.00 día of Vibrador de concreto
  • 1.00 % of Herramienta menor

What labor is used for m2 of Muro en concreto E=0.10 M?

  • 1.00 día of Cuadrilla 1:2 (oficial + 2 ayudantes)

What is the price for m2 of Muro en concreto E=0.10 M?

61,749.12