Unit Cost detail

Localizacion Y Replanteo Lineal

Owner: Geztio Latam

Find the detail of the cost of (m) of Localizacion Y Replanteo Lineal . Materials, equipment, transport and labor required.

Materials
DescriptionUnitQuantityWasteValueSubtotal
Puntilla 1+ 1/2 a 3 pulg. lb 0.025.00 3,900.00 78.00
Estaca de madera h50cm und 0.045.00 3,200.00 128.00
Pintura en esmalte gl 0.025.00 98,600.00 1,972.00
AWaste 108.90
B
Waste + Material subtotal 2,286.90
Equipment
DescriptionUnitQuantityProductionValueSubtotal
Herramienta menor % 1 10 1,118.8858 111.89
Estacion electronica y nivel día 1.00 450.00 87,941.00 195.4244
C
Equipment subtotal 307.3144
Transportation
DescriptionUnitQuantityDistanceValueSubtotal
This Unit Cost does not include any transportation 0.00
D
Transportation subtotal 0.00
Labor
DescriptionTimeUnitQuantityProductionValueSubtotal
Cuadrilla topografía (top + cad + 2 ayu) 100.00 día 1.00 450.00 503,498.63 1,118.8858
E
Labor subtotal 1,118.8858
F
(A + B + C + D + E) Direct cost 3,713.10

Frequently asked questions

What materials are used for m of Localizacion Y Replanteo Lineal?

  • 0.02 lb of Puntilla 1+ 1/2 a 3 pulg.
  • 0.04 und of Estaca de madera h50cm
  • 0.02 gl of Pintura en esmalte

What equipment is used for m of Localizacion Y Replanteo Lineal?

  • 1.00 % of Herramienta menor
  • 1.00 día of Estacion electronica y nivel

What labor is used for m of Localizacion Y Replanteo Lineal?

  • 1.00 día of Cuadrilla topografía (top + cad + 2 ayu)

What is the price for m of Localizacion Y Replanteo Lineal?

3,713.10